Job Description:
Demolition of existing conveyor gallery and installed precast water containment tank
Job Description:
Demolition of existing conveyor gallery and installed precast water containment tank
Job Description:
Installed precast culvert extension and outlet structure.
Job Description:
Removed existing culvert. Formed and poured closed bottom culvert. Additional site work included watermain installation, sheet piling and channel reconstruction.
Job Description:
Removed old bridge deck. Rehabilitated bridge abutments and replaced bridge deck with new steel beams and concrete deck, new barrier walls and associated site work.
Job Description:
Relining of existing culvert and jack. Bored in new overflow pipe.
Job Description:
Formed and poured bridge priers and installed pre-engineered predestrian bridge. Additional site work included walking trails and landscaping.
Job Description:
Removed existing concrete box culvert and replaced with cast-in-place footings and a precast concret box culvert. Additional work included retaining walls and associated channel work.
Job Description:
Removed existing concrete box culvert and replaced with cast-in-place footings and a precast concrete box culvert. Additional work included retaining walls and associated channel work.
Job Description:
Formed and poured bridge piers and installed pre-engineered pedestrian bridge. Additional site work included walking trails and landscaping.
Job Description:
Creek channel stabilization to protect the bank from erosion.
Job Description:
Remove existing culvert and replace with closed bottom precast bottom precast box culvert with associated channel reconstruction and site work.